إنتقل إلى المحتوى الرئيسي

BRD 2.6 Create SMS الحملة, stage 3 of 4, Schedule

Stage 3 is headed "Schedule Your الحملة", with the instruction "Decide when to send your campaign". It offers two choices.

ChoiceEffect
Send immediatelyThe campaign sends as soon as it is created. No further fields appear.
Schedule for laterReveals Date, Time and Timezone. All three must be set.

To schedule a campaign for later:

  1. حدد Schedule for later.
  2. حدد the Date field, labelled Pick a date, and choose a date from the calendar. The calendar opens on the current month and weeks begin on Sunday. Every date before today is disabled, so a campaign cannot be scheduled into the past. The chosen date is then displayed in full, for example August 26th, 2026.
  3. أدخل Time.
  4. Set the Timezone. The dropdown offers 42 zones.
  5. حدد Next Step to move to Review, or رجوع to return to Audience.

Next Step stays greyed out until both Date and Time hold a value. Selecting a date alone is not enough.

Figure key, Create SMS الحملة, stage 3​

  1. Stage indicator with Schedule active.
  2. Heading, Schedule Your الحملة.
  3. Send immediately option.
  4. Schedule for later option.
  5. Date field, showing Pick a date before a date is chosen.
  6. Calendar, with all past dates disabled.
  7. Time field.
  8. Timezone dropdown, defaulting to (GMT-6:00) Central America.
  9. رجوع and Next Step buttons.