BRD 2.6 Create SMS Campaña, stage 3 of 4, Schedule
Stage 3 is headed "Schedule Your Campaña", with the instruction "Decide when to send your campaign". It offers two choices.
| Choice | Effect |
|---|---|
| Send immediately | The campaign sends as soon as it is created. No further fields appear. |
| Schedule for later | Reveals Date, Time and Timezone. All three must be set. |
To schedule a campaign for later:
- Seleccione Schedule for later.
- Seleccione the Date field, labelled Pick a date, and choose a date from the calendar. The calendar opens on the current month and weeks begin on Sunday. Every date before today is disabled, so a campaign cannot be scheduled into the past. The chosen date is then displayed in full, for example August 26th, 2026.
- Ingrese el Time.
- Set the Timezone. The dropdown offers 42 zones.
- Seleccione Next Step to move to Review, or Volver to return to Audience.
Next Step stays greyed out until both Date and Time hold a value. Selecting a date alone is not enough.
Figure key, Create SMS Campaña, stage 3
- Stage indicator with Schedule active.
- Heading, Schedule Your Campaña.
- Send immediately option.
- Schedule for later option.
- Date field, showing Pick a date before a date is chosen.
- Calendar, with all past dates disabled.
- Time field.
- Timezone dropdown, defaulting to (GMT-6:00) Central America.
- Volver and Next Step buttons.